Demolition Waste Management
We work with demolition contractors and developers to plan the waste removal side of a project, from soft strip to the final clearance of hardcore.
How can we help?
Demolition produces large volumes of heavy, mixed material in a short time, and the order in which a building comes down shapes the waste that comes out of it. A good waste plan follows the demolition sequence, keeps valuable materials apart and makes sure hazardous materials are dealt with before anything else.
Before the work starts
Most demolition projects begin with surveys. For buildings that may contain asbestos, which includes most built before 2000, a refurbishment and demolition asbestos survey is needed before work starts. Any asbestos found must be removed by specialists and kept completely separate from other waste.
Other hazardous materials may also need to come out first, such as fluorescent tubes, oil tanks, chemical residues and some coatings.

How it works
- 1Tell us about the projectThe site postcode, the programme and the waste you expect.
- 2We plan containers and collectionsSized to the waste, the access on site and each phase of the work.
- 3Delivery and exchangesContainers arrive and are exchanged or collected as the work progresses.
Following the demolition sequence
Demolition waste comes out in stages, and each stage suits a different approach:
- Soft stripFixtures, fittings, plasterboard, timber, cabling and general waste, often best in segregated skips or RoRo containers
- Structural demolitionBrick, concrete and steel, usually in large volumes and very heavy
- Site clearanceRemaining hardcore, soil and debris, where grab hire may suit stockpiled material
Planning containers for each stage avoids overfilled skips and loads mixed for convenience.
Materials worth segregating
On demolition projects, the materials most worth keeping apart are:
- clean hardcore, which can often be recovered as aggregate
- metals, including structural steel, cabling and pipework
- timber, sorted by grade where practical
- plasterboard, which shouldn’t be mixed with biodegradable waste
Mixed demolition waste is harder to recover and usually costs more to handle.
Weight, access and safety
Demolition waste is heavy, and container weight limits matter. We’ll discuss expected volumes, how loading will be done, where vehicles can stand and how traffic will move around the site.
Planning waste for your demolition project?
Tell us about the project, the site postcode and the waste you expect, and we’ll plan containers and collections to match.
Frequently asked questions
Can mixed demolition waste go into one container?
Only if the contents are suitable for that container and its route. Separating hardcore, metal and timber is usually the better option.
Do you remove asbestos?
Asbestos must be removed by licensed specialists where required and kept separate from all other waste. Talk to us before work starts and we’ll discuss how the rest of the waste can be planned around it.
How quickly can containers be exchanged?
That depends on location and availability. We’ll agree a pattern based on your programme and review it as the work progresses.

Related services
Accredited and audited
Why businesses choose Kenny
- Family business since 1985, based in Worsley and collecting locally every day
- A dedicated Account Management Team, not a call centre
- Clear contracts with no hidden costs
- Duty of Care paperwork included
- Accredited: CHAS, Constructionline, FORS Silver, SMAS Worksafe and Living Wage Employer
Ready to sort your business waste?