Kenny Waste Management is pleased to confirm that the Environment Agency (EA) formally withdrew the partial suspension notice relating to a specific area of our Little Hulton Materials Recovery Facility (MRF) on Monday 16 November 2026, following the successful completion of all required corrective actions.

Our responsibility to local residents and businesses

Kenny Waste Management is committed to operating responsibly and reiterates its sincere apology to local residents and neighbouring businesses affected by the odour issue in early October 2026.

We recognise the importance of minimising the impacts of our operations on local residents and businesses, including housing recently approved by the council and built between our own site and other neighbouring waste treatment and composting facilities.

The issue related to a specific stockpile of non-hazardous waste in one area of our Little Hulton MRF, which had become odorous following an unprecedented reduction in the UK’s onward waste treatment capacity, particularly across the North West.

Working with the Environment Agency

Following engagement with the Environment Agency, our regulator, we took swift action to meet the requirements of its partial suspension notice, issued on 8 October 2026.

This included the introduction of enhanced odour monitoring and odour-control measures, alongside the removal of the affected waste in full compliance with the conditions and timescales stipulated by the EA.

The EA attended our facility on Friday 13 November and confirmed that its representative was very impressed with the actions undertaken, expressing satisfaction with the mitigation measures and swift resolution achieved.

The notice was formally withdrawn with immediate effect on Monday 16 November.

Throughout this period, our Little Hulton MRF remained operational in full compliance with the EA’s requirements. Customer collections and waste management services continued as normal, without disruption or changes to existing waste management arrangements.

Maintaining the highest environmental standards

Although the matter has been resolved and the partial suspension notice fully withdrawn by the EA, we have decided to retain the enhanced odour monitoring and control measures that we introduced to this facility during this period.

These measures have demonstrated their effectiveness and will now form part of our ongoing operating arrangements, going beyond the requirements of our environmental permit.

As a result, our Little Hulton facility now operates with more robust preventative measures and contingencies against potential odour issues.

We believe that constructive engagement between businesses, regulators and local communities is essential to effective environmental management. Our cooperation with the EA throughout this process has enabled us to resolve the matter swiftly and implement lasting improvements.

We reiterate our apology to those affected by the odour issue in early October and remain committed to maintaining the highest standards of environmental management at our Little Hulton facility.