Construction Waste Management
We work with contractors, housebuilders and developers to plan waste collections that keep up with the programme, keep materials segregated where it makes sense and keep the paperwork in order.
How can we help?
A construction site changes week by week. Groundworks produce heavy spoil and hardcore, the build phase produces packaging and offcuts, and fit-out brings plasterboard, cable drums and mountains of cardboard. A waste plan that suited the first month rarely suits the last.
Matching containers to each phase
Different stages of a project suit different equipment:

We’ll look at the programme, the site layout and the vehicle access, then suggest a plan that can change as the project moves on.
How it works
- 1Tell us about the projectThe site postcode, the programme and the waste you expect.
- 2We plan containers and collectionsSized to the waste, the access on site and each phase of the work.
- 3Delivery and exchangesContainers arrive and are exchanged or collected as the work progresses.
Segregation on site
Separating waste at source usually makes more of it recoverable and keeps loads simpler to handle. The materials most worth keeping apart are:
- hardcore and other inert waste
- timber
- metal
- plasterboard
- cardboard and plastic packaging
Space is often the limit. Even one or two extra segregated containers can make a noticeable difference.
Simpler Recycling on construction sites
GOV.UK guidance confirms construction sites are within Simpler Recycling. Dry recyclables, such as cardboard packaging from new appliances and food packaging from site welfare areas, must be kept separate from construction waste. Food waste must be separated too.
The guidance is clear that these materials shouldn’t be mixed or compacted with other construction waste. In practice, that can be as simple as bagging cardboard for separate collection.
Paperwork and duty of care
Whoever produces construction waste keeps a duty of care for it. That means describing it accurately, using registered carriers and keeping waste transfer records. Hazardous waste, such as asbestos or contaminated soil, needs separate assessment and consignment notes.
Planning waste for your site?
Tell us about the project, the site postcode and the waste you expect, and we’ll plan containers and collections to match.

Simpler Recycling on construction sites
Dry recyclables, such as cardboard packaging and food packaging from welfare areas, must be kept separate from construction waste, and food waste must be separated too. GOV.UK guidance is clear that these materials shouldn’t be mixed or compacted with other construction waste.
In practice this can be simple, for example bagging cardboard for separate collection. We’ll agree a practical approach for your site. Read the official Simpler Recycling guidance on GOV.UK.
Read our Simpler Recycling guide for businesses.
Frequently asked questions
How do we choose the right container?
We’ll consider the type of waste, its weight and volume, the access and space on site and how often you need collections.
Can you coordinate several waste streams on one site?
Yes. We’ll discuss a coordinated plan and confirm which services we deliver directly and which through approved partners.
What happens to cardboard on a construction site?
It needs to be kept out of construction skips and collected as dry recycling. We can advise on a practical way to do that on your site.
Do you work outside Greater Manchester?
We can discuss construction projects further afield. Tell us the site postcode and we’ll confirm what we can provide.

Related services
Accredited and audited
Why businesses choose Kenny
- Family business since 1985, based in Worsley and collecting locally every day
- A dedicated Account Management Team, not a call centre
- Clear contracts with no hidden costs
- Duty of Care paperwork included
- Accredited: CHAS, Constructionline, FORS Silver, SMAS Worksafe and Living Wage Employer
Ready to sort your business waste?

